The MV Poseidon comes out of dry dock and is ready for works.

The MV Poseidon comes out of dry dock and is ready for works.

The MV Poseidon comes out of dry dock and is ready for works.

Neptune’s flagship vessel came out of dry dock this month after 6 months of works and sea trails. The MV Poseidon is an excellent seagoing DP+1 Ice Classed vessel with a comprehensive survey spread.  The survey spread includes a hull mounted Reson 7125 MBES, IXSEA’s GAPS deployed through a purpose built moonpool, an Applanix POS MV 320, a 20 tonne a-frame and two cranes.  More details can be found in the Vessels section of this website. The MV Poseidon is now available for its first project.


Division

NEPTUNE EHF  |  Iceland Office Tel: +354 527 7770  |  Aberdeen Office Tel: +44(0)1224841375  |  info@neptune.is